Your building received a Dangerous Building Order (מבנה מסוכן). What now?

We fix the defects in the order under an engineer’s supervision and see it through until the order is removed. We take the final payment only after the order is removed.

The deadline is written in the order itself. Do not wait — send us a photo of it on WhatsApp today.

What the order is

A Dangerous Building Order (מבנה מסוכן) is an official order (צו) issued by the local authority to fix defects it has identified in a building. The defects are listed in a document given to the owners or residents. Once all of them are properly fixed, the order is removed.

The cause is usually the same: the rebar inside the concrete rusts, expands and cracks the shell. Water gets in and speeds up the decay until pieces of concrete and plaster come loose and can fall.

The risks

  • Falling concrete and plaster — a danger to residents, passers-by and cars parked below.
  • The owners are liable for damage while the defects remain.
  • If the work is not done in time, the municipality may act — up to carrying out the work at the owners’ expense.

The deadlines

The deadline for fixing the defects is written in the order and depends on how dangerous the building is.

So the first step is to show us the order: we will tell you what can be done by that date and where to start.

What must be done

  1. Remove the damage

    We take off every loose piece of concrete and plaster from the facade.

  2. Clean and reinforce the rebar

    We clean off the rust and add bars where needed.

  3. Protect against corrosion

    We apply Monotop — an anti-corrosion coat that also bonds the next layer.

  4. Rebuild the volume

    Layers of Sika Rep, a cement mortar for concrete repair.

  5. Finish and protect

    Cement plaster or exterior filler to suit the building, then paint or acrylic shlicht.

Who signs

The work follows the engineer’s instructions under his supervision. When it is done, an external engineer checks that it meets the municipality’s requirements.

The engineer arranges an on-site meeting with a city representative — and the order is removed. From then on the building is officially no longer classed as dangerous.

How it went for others

A building under an order: what we found, what we did, how it turned out.

Dangerous Building Order: common questions

How is a Dangerous Building Order removed?
Every defect listed in the order is fixed, following the engineer’s instructions and under their supervision. At the end an external engineer checks the work and books a visit by a municipal representative on site — then the order is removed.
Who confirms the building is no longer “dangerous”?
An external engineer checks that the work meets the municipality’s requirements. After the municipal representative’s site visit, the building officially leaves the מבנה מסוכן status.
How long do we have to fix the defects?
The deadline is written in the order itself and depends on how dangerous the defects are. Send us a photo of the order on WhatsApp — we will tell you what can be done by that date and where to start.
What happens if the work is not done in time?
While the defects remain, the owners are liable for damage. If the work is not done in time, the municipality may act — up to carrying out the work at the owners’ expense.
When do we pay?
We take the final payment only after the order is removed.
Which cities do you work in?
All over Israel, from Haifa and the north to Eilat. We have completed projects in Tel Aviv, Rishon LeZion, Kfar Saba, Ashkelon, Sderot and Eilat.

Urgent request

Describe the situation and we will call you back soon. If you have a photo of the order, WhatsApp is faster.